Search

Liebherr cranes working on final phase of Sagrada Família project

The Temple of the Sagrada Família will represent the future of modern Catalonia,” this is how the architect Antonio Gaudí described his masterpiece, which began construction in 1882 in Barcelona.

Liebherr cranes working on final phase of Sagrada Família project

The 710 HC-L 32-64 Litronic and 125 HC-L luffing jib cranes are ideal for this challenging project

Liebherr's last crane finishes work on Spin Tower in Frankfurt

Two 230 HC-L 8/16 and two EC-B cranes from Liebherr have been helping build the 128 m-high hotel and office tower

New NC-B 12-70 demonstrates its strength in Saudi Arabia

Just one look from above is enough to see the biggest challenge presented by the construction site in Medina: there’s not a lot of space.

New NC-B 12-70 demonstrates its strength in Saudi Arabia

With a 12-tonne lifting capacity and a 70-metre reach, the NC-B 12-70 is the most powerful tower crane in the NC-B series